Sealing Development

Our team are experts in the whole process for sealing with extensive market knowledge of major suppliers, preferred markets, and technologies. We created A-Class surface models to CAS standard and will benchmark to offer a detailed analysis of competitor vehicles.

  • Concepts
  • Target setting
  • Hardpoints/parameter books
  • Prototype supply
  • Supplier sourcing
  • Supplier management
  • Manufacturing Process
  • Parts & Tooling line-ups & costings
  • Project Delivery
  • Change Management
  • Sealing testing and development
Profile Design

Full profile design capability for any application:

  • Initial concept design, based on best practice.
  • Profile development using physical models (breadboards) and simulation tools (FEA)
  • Contact patch, interference, & swing analysis
  • Swept path analysis.
  • Interfacing parts design
  • Material selection, splits, & development (EPDM, TPE)
  • Surface finish – coating/flocking
  • DFM – full understanding of EPDM extrusion process, online vs offline processes, and optimisation
  • Design for assembly – mounting methods, insertion/extraction analysis
  • Tolerance analysis, including over-slam.
  • Attributes – water management, wind-noise, door closure force, squeak
Mould Design

Offering a fully surfaced mould design:

  • EPDM part mouldings, Encapsulations, 2K Plastic mouldings.
  • Initial concept design, based on best practice.
  • A-surface modelling for function, including aesthetics.
  • B-surface design for consistent interface to mounting surface.
  • Insert design.
  • Core hole design.
  • Matched material thicknesses and CLD analysis.
  • Contact patch, interference, & swing analysis.
  • Interfacing parts design.
  • Surface finish – coating/flocking
  • DFM – full understanding of moulding process & finishing operations.
  • Design for assembly – mounting methods, clip design
  • Tolerance analysis, including over-slam.
  • Attributes – water management, wind-noise, door closure force, squeak. 
Benchmarking

Detailed analysis of competitor vehicles

  • Static benchmarking for parts layout
  • Dynamic benchmarking for attribute analysis (NVH, water)
  • Rear quarter glass fixed in rear door.
  • Full View
  • Rear Glass short drop
  • C Post Seal Moulding
  • B/C Post
  • F Glass Short Drop
  • B Post Seal Moulding

Contact our Sealing Development team directly

Contact our Sealing Development team directly